Portfolio

Case studies with numbers attached

Every engagement below started with measurement. The results are the metrics we baselined before and after the work.

ISP / Carrier2025

Cutting peak-hour latency by 68% for a regional ISP

Regional fibre ISP, ~14 000 subscribers

A growing ISP was losing customers to peak-hour congestion complaints despite having spare upstream capacity. A structured health audit found the bottleneck in the routing and edge layers, not the transit links.

-68%
Peak-hour latency
0.02%
Peak packet loss (from 1.9%)
Read the case study